Our Projects
Foundation & Piling Projects
Real bored and driven piling projects in Chonburi, Si Racha, Bang Lamung, Pattaya, Rayong and Chachoengsao — covering drilling, driving, testing and additional services.
Popular Projects
Top 10 Most Viewed Projects
Showing 12 of 70 projects
Pre-boring Piling at Solar Power Plant, Tha Yang District, Phetchaburi
Project Details Location: Solar Power Plant, Tha Yang District, Phetchaburi Type of Work: Solar Farm Scope of Work: Pre-boring pile positions for the structure supporting solar panels Specifications: Diameter 25 cm., depth 2.5 m. Quantity: 12,400 Working Period: 23/01/2569-28/05/2569 Machinery Used: 3 track-mounted drilling rigs
Bored Piling at Khao Phra Tamnak, Bang Lamung District, Chonburi
Project Details Location: Khao Phra Tamnak, Nong Prue Subdistrict, Bang Lamung District, Chonburi Type of Work: Building/Factory Scope of Work: Bored piling for foundation to support the structural erection of a 4-storey office building Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 68 piles Working Period: 03/05/2569-11/05/2569 Machinery Used: 1 track-mounted drilling rig
Bored Piling Work for The Estate Village Project, Mueang Chonburi District, Chonburi Province
Project Details Location: The Estate Village Project, Na Pa Sub-district, Mueang Chonburi District, Chonburi Province Type of Work: Building/Housing Project Scope of Work: Bore piles for foundation supporting the construction of housing project structure Specifications: Diameter 35 cm., depth 4 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 280 Cu Quantity: 46 piles Working Period: 09/07/2569-22/07/2569 Machinery Used: 1 Rubber-Tired Drilling Rig
Bored Piling Work for Khao Talo Soi 4, Bang Lamung District, Chonburi Province
Project Details Location: Khao Talo Soi 4, Nong Prue Sub-district, Bang Lamung District, Chonburi Province Type of Work: Building/Housing Project Scope of Work: Bore piles for foundation supporting the construction of a 2-story building Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 60 piles Working Period: 02/05/2569-11/05/2569 Machinery Used: 1 Rubber-Tired Drilling Rig
Bored Piling Work for Amata City Rayong, Map Yang Phon Sub-district, Pluak Daeng District, Rayong Province
Project Details Location: Amata City Rayong, Map Yang Phon Sub-district, Pluak Daeng District, Rayong Province Type of Work: Fence/Retaining Wall Scope of Work: Bore piles for foundation of factory fence and retaining wall Specifications: Diameter 20 cm., depth 3 m., deformed bar 12 mm. length 3.50 m. 3 bars, stirrup 6 mm.@20 cm., concrete 240 Cu, pull Dowel bars protruding above ground 50 cm. Quantity: 157 piles Working Period: 22/02/2568-26/02/2568 Machinery Used: 1 Rubber-Tired Drilling Rig
Bored Piling Work for Factory Warehouse, Nong Irun Sub-district, Ban Bueng District, Chonburi Province
Project Details Location: Nong Irun Sub-district, Ban Bueng District, Chonburi Province Type of Work: Warehouse/Factory Scope of Work: Bore piles for foundation supporting the construction of factory warehouse structure Specifications: Diameter 35 cm., depth 9 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 129 piles Working Period: 15/05/2569-25/08/2569 Machinery Used: 1 Rubber-Tired Drilling Rig
Bored Piling Work for Factory Warehouse, Nong Yai District, Chonburi Province
Project Details Location: Nong Yai District, Chonburi Province Type of Work: Warehouse/Factory Scope of Work: Bore piles for foundation supporting the construction of factory warehouse structure Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 89 piles Working Period: 19/02/2569-23/03/2569 Machinery Used: 1 Track Drilling Rig
Bored Piling Work for 25 Rai Project, Khao Khan Song Sub-district, Si Racha District, Chonburi Province
Project Details Location: 25 Rai Project, Khao Khan Song Sub-district, Si Racha District, Chonburi Province Type of Work: Fence/Retaining Wall Scope of Work: Bore piles for fence and retaining wall construction Specifications: Diameter 20 cm., depth 2 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 168 piles Working Period: 03/02/2569-05/03/2569 Machinery Used: 1 Rubber-Tired Drilling Rig
Pilot Test Piling Work for CHEC Laem Chabang Project
Project Details Location: CHEC Laem Chabang Project, Si Racha District, Chonburi Province Type of Work: Pilot Test Scope of Work: Drive Pilot Test piles according to the positions and depths specified by the engineer Specifications: Pile [] 0.40x0.40x18.00 m. Quantity: 5 piles Working Period: 03/09/2568 (1 day) Machinery Used: 1 Track Crane
Bored Piling Work for Santikham Housing Project, Bang Lamung District
Project Details Location: Santikham, Nong Pla Lai Sub-district, Bang Lamung District, Chonburi Province Type of Work: Building/Housing Project Scope of Work: Bore piles for foundation supporting the construction of home extensions Specifications: Diameter 35 cm., depth 6 m., deformed bar 12 mm. 6 bars, stirrup 6 mm.@20 cm., concrete 240 Cu Quantity: 16 piles Working Period: 13/06/2569-14/06/2569 Machinery Used: 1 Rubber-Tired Drilling Rig
Driven Piling Work for Building/Factory, Nong Yai District, Chonburi Province
Project Details Location: Building/Factory, Nong Yai District, Chonburi Province Type of Work: Building/Factory Scope of Work: Drive piles according to the positions and depths specified in the construction drawings to support the factory structure Specifications: Pile [] 0.40x0.40x10.00 m. Quantity: 222 piles Working Period: 23/07/2568-10/08/2568 Machinery Used: 1 Track Crane
Driven Piling Work for Retaining Wall, Bang Phli District, Samut Prakan Province
Project Details Location: Bang Phli District, Samut Prakan Province Type of Work: Retaining Wall Scope of Work: Drive piles according to the positions and depths specified in the construction drawings to support the retaining wall structure Specifications: I-pile 0.30x0.30x10.00 m. Quantity: 254 piles Working Period: 19/07/2568-04/08/2568 Machinery Used: 1 Tripod Crane