Foundation & Piling Projects
Real bored and driven piling projects in Chonburi, Si Racha, Bang Lamung, Pattaya, Rayong and Chachoengsao — covering drilling, driving, testing and additional services.
Popular Projects
Top 10 Most Viewed Projects
Showing 12 of 56 projects
Bored Piling Work for Supalai Housing Project, Nong Prue, Bang Lamung District, Chonburi
Project Details Location: Supalai Housing Project, Nong Prue, Bang Lamung District, Chonburi Type of Work: Building/Housing Project Scope of Work: Bored piling for foundations supporting housing project building structure construction Specifications: Diameter 35 cm, depth 5 m, 12 mm deformed bars, 6 bars, 6 mm stirrups @20 cm, concrete 240 Cu Quantity: 28 piles Working Period: 22/10/2568-24/10/2568 Machinery Used: 1 track drill
Bored Piling Work, Mueang Chon District, Chonburi
Project Details Location: Mueang Chon District, Chonburi Type of Work: Building/Housing Project Scope of Work: Bored piling for foundations supporting house structure construction Specifications: Diameter 35 cm, depth 6 m, 12 mm deformed bars, 6 bars, 6 mm stirrups @20 cm, concrete 240 Cu Quantity: 13 piles Working Period: 26/03/2569-27/03/2569 Machinery Used: 1 rubber-tired drill
Pile Pre-boring Work for Solar Farm Project, Lom Sak District, Phetchabun
Project Details Location: Solar Farm Project, Lom Sak District, Phetchabun Type of Work: Solar Farm Scope of Work: Pre-boring at pile positions for structures supporting solar panels Specifications: Diameter 25 cm, depth not exceeding 3 m Quantity: 1,762 piles Working Period: 13/03/2568-30/04/2568 Machinery Used: 2 track drills
Bored Piling Work for 47 Rai, Makham Khu, Nikhom Phatthana District, Rayong (In Progress)
Project Details Location: 47 Rai, Makham Khu, Nikhom Phatthana District, Rayong Type of Work: Building/Factory Scope of Work: Bored piling at positions and depths specified in construction drawings to support building and factory foundation structures Specifications: Diameter 50 cm, depth 5.5 m, cut and tie 2 mm deformed bars, 8 bars, 6 m long, 9 mm spiral stirrups Without Casing, with Dowel bars protruding 50 cm above ground level, spiral stirrups at head and tip @10 cm, middle @20 cm And Diameter 40 cm, depth 5.5 m, cut and tie 2 mm deformed bars, 6 bars, 6 m long, 9 mm spiral stirrups, Without Casing, with Dowel bars protruding 50 cm above ground level, spiral stirrups at head and tip @10 cm, middle @20 cm Quantity: In Progress Working Period: 01/09/2569-In Progress Machinery Used: 2 track drills
Bored Piling Work for TAO TAO Project, Nong Phai Kaeo, Nong Yai District, Chonburi
Project Details Location: TAO TAO Project, Nong Phai Kaeo, Ban Bueng District, Chonburi Type of Work: Building/Factory Scope of Work: Bored piling at positions and depths specified in construction drawings to support building foundation structures Specifications: Quantity: 688 piles Working Period: 10/06/2568-26/10/2568 Machinery Used: 2 track drills
Bored Piling Work, JJL Project, Bo Thong District, Chonburi Province
Project Details Location: JJL Project, Bo Thong District, Chonburi Province Type of Work: Warehouse/Factory Scope of Work: Bored piling for foundation to support factory warehouse structure erection Specifications: Quantity: 77 piles Work Period: 02/10/2568-17/10/2568 Machinery Used: 1 track drill, 1 rubber-tired drill
Bored Piling Work, Thung Klom Tan Man, Bang Lamung District, Chonburi Province
Project Details Location: Thung Klom Tan Man, Bang Lamung District, Chonburi Province Type of Work: Building/Housing Project Scope of Work: Bored piling for foundation to support housing project structure erection Specifications: Diameter 35 cm, depth 5 m, 12 mm deformed rebar 6 bars, 6 mm stirrups @20 cm, concrete 240 Cu Quantity: 135 piles Work Period: 05/09/2568-19/08/2569 Machinery Used: 1 rubber-tired drill
Pre-boring Piling Work, Project Solar Sino Thai, Kanchanaburi Province
Project Details Location: Solar Sino Thai, Kanchanaburi Province Type of Work: Solar Farm Scope of Work: Pre-boring pile positions for structure supporting solar panels Specifications: Quantity: 25,000 piles Work Period: Machinery Used: 2 track drills, 1 rubber-tired drill
Bored Piling Work, Thap Ma Subdistrict, Mueang Rayong District, Rayong Province
Project Details Location: Thap Ma Subdistrict, Mueang Rayong District, Rayong Province Type of Work: Building/Housing Project Scope of Work: Bored piling for foundation to support housing project building structure erection Specifications: Diameter 35 cm, depth 6 m, 12 mm deformed rebar 6 bars, 6 mm stirrups @20 cm, concrete 240 Cu Quantity: 149 piles Work Period: 23/12/2568-10/01/2569 Machinery Used: 1 track drill
Bored Piling Work, Pong Subdistrict, Bang Lamung District, Chonburi Province
Project Details Location: Pong Subdistrict, Bang Lamung District, Chonburi Province Type of Work: Building/House Scope of Work: Bored piling for foundation to support house extension structure erection Specifications: Diameter 35 cm, depth 5 m, 12 mm deformed rebar 6 bars, 6 mm stirrups @20 cm, concrete 240 Cu Quantity: 10 piles Work Period: 03/04/2569-04/04/2569 Machinery Used: 1 track drill
Pre-boring Piling Work, Double A Factory, Si Maha Phot District, Prachinburi Province
Project Details Location: Double A Factory, Si Maha Phot District, Prachinburi Province Type of Work: Industrial Factory Scope of Work: Pre-boring pile positions for factory building structure Specifications: Diameter 50 cm, depth 8 m Quantity: 115 Work Period: 04/06/2569 - 26/06/2569 Machinery Used: 1 track drill
Bored Piling Work, UFM Project, Bo Thong District, Chonburi Province
Project Details Location: UFM Project, Bo Thong District, Chonburi Province Type of Work: Building/Factory Scope of Work: Bored piling for foundation to support factory building construction Specifications: Bored piles diameter 35 cm, depth 5 and 6 m, 12 mm deformed rebar 6 bars, 6 mm stirrups @20 cm, concrete 280 Cu Quantity: 586 piles Work Period: 19/01/2568-06/03/2568 Machinery Used: 3 track drills, 1 rubber-tired drill